Automatic Carbonation Machine High Speed Mixing Carbonator Beverage Mixer

Customization: Available
Additional Capabilities: Milling
Application: Liquid

Product Description

i

Basic Specifications

Application Area
Metallurgy&Mineral
Certification
CE, ISO
Condition
New
Mixing Drum Shape
Disc
Stirring Type
Spiral
Warranty
1 year
Working
High Speed Mixer
Output Capacity
3000--10000kg/H
Mixing Ratio Scope
3:1-6:1
CO2 Content Tims
<=3.8times
Carbonated Times Precision
+_0.15%
Mixing Rate Precision
0.15bvx
Compressed Air Pressure
0.6-1MPa
Compressed Air Consumption
1.0m3/H
CO2 Supply Pressure
0.8-1MPa
Mixing Temperature
<=4
Layout Type
Horizontal
Transport Package
Wooden Case
Specification
2000KG
Origin
China
Production Capacity
1000 PCS/Year

Product Description

Automatic Carbonation Machine

Mainly used for mixing machining of all kinds of carbonated drinks, it also can be used for mixing machining of pulpiness drinks, and ferment drinks. With the function of GOB system, after vacuum oxygen degassing, sterilized water with CO2 and sugar one-shot synthesis according to the customer's demand proportion.

High Speed Mixing Carbonator
Beverage Mixer Process

The dispensing system is needed in the production of aerated beverages and juice beverages. Contains hot melt syrup, homogenization, degassing and other processes to process raw materials so that drinks can be delivered to fillers.

Beverage Mixer Equipment

Equipment Features

The machine incorporates advanced cooling mixer technology with international standards. Key characteristics include high-quality 304 stainless steel jointing, polish roughness up to 0.4 standard, and automatic CIP rinsing control. The sanitary conditions are reliable and the system features high automation, requiring minimal operator intervention after startup.

Main Technical Parameters

Description Specification
Output capacity3000Kg/h
Mixing ratio scope3:1 ~ 6:1
CO2 content times≤3.8 times
Carbonated times precision±0.15%
Mixing rate precision0.15BVX
Compressed air pressure0.6 ~ 1Mpa
Compressed air consumption1.0M3/h
CO2 supply pressure0.8 ~ 1Mpa
CO2 consumption46 kg/h (at 3.8 times content)
Mixing temperature≤4ºC
Purified water supply pressure0.3Mpa
Purified water temperature18ºC - 25ºC
Syrup pressure0.15-0.25MPa
Total power4.45KW
Overall dimension2510*1500*2500mm

Supply & Guarantee Terms

No. Item Details
1Standard packingExport package suitable for long distance transport by sea & truck
2DeliveryStandard lead time since receipt of down-payment
3Payment terms30% T/T down-payment, 70% T/T before shipment
4Guarantee12 months after installation or 15 months after shipping

Quality Assurance & Service

Certification

Our equipment follows international quality management systems including ISO9001:2000 and CE Certification. Each unit undergoes a 24-hour continuous test run before leaving the factory to ensure stability in water pipelines, pneumatic, electrical, and mechanical components.

Workshop
Service

Installation & Training

We provide professional installation services where experienced technicians guide the setup, debugging, and trial production. Technical training covers equipment structure, maintenance, control, and operation to ensure your staff can manage all functions and perform minor troubleshooting independently.

System
After-sales
📦

Packaging & Loading

Packing 1
Packing 2
Packing 3

Machines are packed in high-strength boards to prevent collision damage. Containers are loaded directly at our facility with locked doors before departure. Professional engineers precisely calculate reinforcement and load-bearing requirements for every wooden case to ensure maximum stability during sea or truck transport.

?

Frequently Asked Questions

Are you a manufactory or a trading company?
We are a professional manufactory providing direct factory pricing with high-quality standards. Visitors are always welcome to our facility.
What is the warranty period for the machinery?
We offer a 1-year guarantee on all machines along with life-long technical support and spare parts available at cost price.
How long does delivery take after payment?
The delivery time depends on the specific machine configuration confirmed, typically aligning with standard industry production timelines.
Do you provide on-site installation services?
Yes, we dispatch experienced engineers to your factory to handle equipment installation and provide comprehensive operational training for your staff.
What happens if I need spare parts in the future?
Upon purchase, we provide a detailed spare parts list for your reference. We maintain a stock of wearing parts to ensure quick supply whenever needed.
What kind of after-sales technical support do you offer?
We provide 24/7 phone guidance for troubleshooting. If a problem cannot be solved remotely, we can arrange for technicians to visit your site for repairs.

Related Products