Mainly used for mixing machining of all kinds of carbonated drinks, it also can be used for mixing machining of pulpiness drinks, and ferment drinks. With the function of GOB system, after vacuum oxygen degassing, sterilized water with CO2 and sugar one-shot synthesis according to the customer's demand proportion.
The dispensing system is needed in the production of aerated beverages and juice beverages. Contains hot melt syrup, homogenization, degassing and other processes to process raw materials so that drinks can be delivered to fillers.
The machine incorporates advanced cooling mixer technology with international standards. Key characteristics include high-quality 304 stainless steel jointing, polish roughness up to 0.4 standard, and automatic CIP rinsing control. The sanitary conditions are reliable and the system features high automation, requiring minimal operator intervention after startup.
| Description | Specification |
|---|---|
| Output capacity | 3000Kg/h |
| Mixing ratio scope | 3:1 ~ 6:1 |
| CO2 content times | ≤3.8 times |
| Carbonated times precision | ±0.15% |
| Mixing rate precision | 0.15BVX |
| Compressed air pressure | 0.6 ~ 1Mpa |
| Compressed air consumption | 1.0M3/h |
| CO2 supply pressure | 0.8 ~ 1Mpa |
| CO2 consumption | 46 kg/h (at 3.8 times content) |
| Mixing temperature | ≤4ºC |
| Purified water supply pressure | 0.3Mpa |
| Purified water temperature | 18ºC - 25ºC |
| Syrup pressure | 0.15-0.25MPa |
| Total power | 4.45KW |
| Overall dimension | 2510*1500*2500mm |
| No. | Item | Details |
|---|---|---|
| 1 | Standard packing | Export package suitable for long distance transport by sea & truck |
| 2 | Delivery | Standard lead time since receipt of down-payment |
| 3 | Payment terms | 30% T/T down-payment, 70% T/T before shipment |
| 4 | Guarantee | 12 months after installation or 15 months after shipping |
Our equipment follows international quality management systems including ISO9001:2000 and CE Certification. Each unit undergoes a 24-hour continuous test run before leaving the factory to ensure stability in water pipelines, pneumatic, electrical, and mechanical components.


We provide professional installation services where experienced technicians guide the setup, debugging, and trial production. Technical training covers equipment structure, maintenance, control, and operation to ensure your staff can manage all functions and perform minor troubleshooting independently.



Machines are packed in high-strength boards to prevent collision damage. Containers are loaded directly at our facility with locked doors before departure. Professional engineers precisely calculate reinforcement and load-bearing requirements for every wooden case to ensure maximum stability during sea or truck transport.