Preheater/Fruit and Vegatable Processing Machine/Processing Line/ Processing Plant/ Processing Factory/ Proudution Line/Making Machines

Customization: Available
After-sales Service: Field Installation, Commissioning & Personal Trai
Warranty: One Year

Product Description

Technical Specifications

Model NO.
JP-SinoRoy
Type
Fruit & Vegetable Production Line
Voltage
380V
Material Capacity
1-30tons/H
End-Products
Mango Jam, Sauce, Ketchup
Certification
CE, ISO9001
Material
Stainless Steel 304/316
HS Code
8548900090

Product Overview

Preheater: Designed for preheating vegetables and fruit pulp to deactivate enzymes. This deactivation prevents discoloration and hydrolyzation, ensuring the quality of subsequent processing steps.

Processing Machine
Processing Line

Key Features

  • Precise Temperature Control: Range of 55ºC-90ºC, effectively raising juice yield for concentrated fruit and vegetable pulp.
  • Automated System: Intelligent control of sterilization temperature, steam pressure, and material flow.
  • Premium Components: Pumps, valves, and electronic components utilize world-famous professional brands.
  • Integrated Cleaning: Equipped with a CIP cleaning system and comprehensive pressure protection/alarm systems.
  • Scalable Capacity: Options ranging from 5 to 100 Tons per hour to suit various production needs.

Technical Parameters

Model Capacity Preheating Temp Steam Consumption Dimensions (mm)
JP-P-MM-301-5T 5Ton/H 55-90°C 400 kg/h 3000x1100x1600
JP-P-MM-301-10T 10Ton/H 55-90°C 600 kg/h 4000x1100x1600
JP-P-MM-301-15T 15Ton/H 55-90°C 800 kg/h 5000x1100x1600

Processing Range

We provide comprehensive processing solutions for a wide variety of fruit treatments, including:

Product Range
Key Machines
  • Fruit juice, pulp, puree, paste, and concentrated nectar.
  • Jams, jellies, marmalades, and fruit snacks.
  • Dried, fried, crystallized, and pickled fruits.
  • Fruit extracts, powders, essences, and oils.

Comprehensive Solutions

1Process Design: Optimization of processing technology and bespoke process flow design.

2Factory Planning: Accurate layout design based on facility size, including pipelines and cable connections.

3Installation & Training: Global engineering support for installation, commissioning, and staff operational training.

4Lab Research: Mini-processing lines available for pilot production and formulation research.

Factory Design
Installation
Lab Research

Why Partner With Us?

Turnkey Solutions
Versatility
Top Hardware
  • Proven History: Over 300 successful projects worldwide spanning four decades.
  • Turnkey Solutions: From scientific concept to full-scale production (A to Z).
  • Versatile Design: Multi-functional lines that adapt to changing market consumption habits.
  • Intellectual Property: Patented energy-saving sterilization and high-performance concentration equipment.
Global Visits
Manufacturing Process

Frequently Asked Questions

Q1: What should be prepared before purchasing a production line?
You should prepare necessary import licenses, factory land with utilities (water, electricity, fuel), and conduct a target market research or feasibility study to control risks.
Q2: What information is required for an accurate inquiry?
Please provide details on the raw material you wish to treat, the desired final product, your required hourly capacity, and your estimated budget range.
Q3: Why choose your processing solutions?
We provide value-added services including flowchart design, formula research, and full-chain material supply. Our experience covers over 300 successful global cases.
Q4: What technical support is available during ordering?
We offer process know-how, pre-investment studies, feasibility reports, detailed engineering, and full turnkey project implementation.
Q5: What is the typical ordering and manufacturing process?
The process involves inquiry, specification confirmation, engineering design, manufacturing, factory assembly testing, sea shipment, and overseas engineering for final setup.
Q6: How long does the entire implementation take?
Manufacturing typically takes 60-90 working days, with an additional 30 days for shipping and 30 days for installation. We recommend contacting us 6 months in advance.

Related Products