Product Overview
🌀
Spiral pre-cooking enzyme machine is a critical pretreatment of raw material, used for enzyme deactivating, color-protecting, fruit softening, and pasteurizing. It is ideal for processing vegetables and fruits like mushrooms, peaches, beans, carrots, and more.
Product Parameters
- Item No: JP-P-MM-304
- Major Materials: SUS 304 (or customization)
- Continuous water bath system
- Stepless speed regulation and automatic temperature control (≤ 100°C)
| Model |
Capacity |
Rated Power (kw) |
Screw diameter (mm) |
Dimensions (mm) |
| JP-P-MM-304-5T |
5Ton/H |
2.2 |
500 |
5000x600x700 |
| JP-P-MM-304-10T |
10Ton/H |
3 |
800 |
6000x600x700 |
Our Key Advantages
🏆
Comprehensive Integration: We are a unique supplier offering a full-chain solution including machinery manufacturing, factory management experience, and product marketing insights.
🔹 40+ Years of Industry Experience
🔹 300+ Global Projects Completed
🔹 World-Class Hardware (Siemens, ABB, Spirax Sarco)
🔹 One-Stop Turnkey Solutions (A to Z)
Value-Added Services
Design & Installation
We provide accurate processing line layouts based on factory dimensions, including all pipelines and cable calculations.
Intellectual Property & Innovation
Our equipment features patented technology in large vacuum evaporation and tube-in-tube sterilization, achieving up to 30% energy savings compared to industry standards.
Frequently Asked Questions
1. What should be prepared before purchasing a production line?
You need a valid license for operation and import, factory land with utilities (water, electric, fuel), and a comprehensive market research or feasibility study to control risks.
2. What information is required for an accurate inquiry?
Please specify the raw materials to be treated, the desired final product, the hourly processing capacity, and your estimated budget range.
3. What services are included in a "Turnkey" project?
It covers everything from process know-how and feasibility reports to detailed engineering, manufacturing, assembly, and training your local team for maintenance.
4. How long does the ordering and installation process take?
Typically, manufacturing takes 60-90 working days, followed by 30 days for shipping and 30 days for installation. We recommend contacting us 6 months in advance.
5. Do you provide training for local workers?
Yes, our engineers provide on-site training to teach your staff how to operate, clean, maintain, and repair the machines effectively.
6. Are the machines suitable for multiple types of products?
Yes, our designs emphasize versatility, ensuring one processing line can serve multiple functions and adapt to changing market habits.